Hi, I have a control that have 3 different named audits/control tests, with each there own due dates.
How is that possible to register?
It seems that I only can put in one specific audit per control. When I try to add a new audit to an control it seems that I can enter how the actual audit was going. Not adding a brand new audit with a new name to the same control.
Thanks